Dear Andrzej:
We also use a dummy method of, say, 3600 seconds (1 hour), and run
however many times we need. If you want to reduce the size of the
resulting file, change the sampling rate to 10 seconds or more (rather
than the many default which is many times per second.)
You can also make use of the waiting time to monitor mass 18 or mass 40,
if either of those is of interest.
Peter Sauer
Indiana University
On 1/7/2010 3:12 PM, Valérie SAUVINET wrote:
> Dear Andrzej,
>
> I use ISODAT 3.0. To delay the beginning of my analyses, I created a method of acquisition without injection of sample and reference gas. According to the timeout you want, you can change the acquisition time. I have tested up to 20h of waiting, the data file weighed 13KB.
>
> Best wishes
>
> Valérie Sauvinet
>
> Centre de Recherche en Nutrition Humaine Rhône-Alpes
> Centre Hospitalier Lyon Sud - Bât 3D
> 165 chemin du Grand Revoyet
> 69310 PIERRE BENITE
> 33 (0)4 78 86 29 83
> [log in to unmask]
>
>
>
> -----Message d'origine-----
> De : Stable Isotope Geochemistry [mailto:[log in to unmask]] De la part de Andrzej Wilamowski
> Envoyé : jeudi 7 janvier 2010 15:22
> À : [log in to unmask]
> Objet : [ISOGEOCHEM] How to do a delayed start of a measurement sequence?
>
> Dear Listmembers,
> using ISODAT 2.82, I would like to start a measurement sequence with a time shift meaning, that it would start at a given time, or alternatively, after a given period of time.
> Could somebody advise me on how to do it?
> Thanks,
> Andrzej
>
> --
> Andrzej Wilamowski
> Institute of Geological Sciences
> Polish Academy of Sciences
> Twarda 51/55, 00-818 Warszawa, Poland
> E-mail: [log in to unmask]
>
|