Morning,
I am in the shop. Now until close.
Things to do:
--Machine Caster shims
--Cut and drill seat belt tabs
--machine last two camber shims
1/8" thickness
--grind paint off of frame where members need to be welded for gearbox
--shoulder straps of seat belt securement
rules say they can't move side-to-side. Design and fabricate a system
to ensure this rule is met (see rules)
also modify firewall/frame to protect shoulder belts from the engine
(see rules)
--make lower shock mount for front suspension
to be mounted on lower A-arm (see model)
and the list goes on.
See you around the shop,
--
Sam Flinkström
----------------------------
PLEASE READ!!!!
List is now configured to send replies to the original poster. This will cut down on responses intended for the original sender from getting sent to the entire list. If you wish to reply to the list, enter "[log in to unmask]" (without the quotes)
Happy Racing
----------------------------
UVM SAE Mini Baja 2009-2010
nothin' mini about it